Projects: Chronological Projects:
Chronological
By Type

Art museums
University Museums
History and Science Museums
Private Collections

(Most recent at top)

2005–Present | 2000–2004 | 1995–1990 | 1990–1999 | 1985–1989 | 1977–1984

 

2005-Present

La Plaza de Cultura y Artes
Los Angeles, CA (2008)
Henry Estrada, Director of Programs and Exhibitions
Edward Avila, Interim Executive Director
Erick Serrato, Director of Development
$32 million
Size to be determined on an approximately 2 acre site
Building Space Program
Documents to Prepare a Cost Estimate
Project in Process

MassArt Gallery
Massachusetts College of Art + Design

Boston, MA (2008)
Linda Sevey, Director of Institutional Advancement
SF to be determined on a 6 acre campus
Strategic Goals and Preliminary Space Needs Statement

Wisconsin Forestry Education Center
Milwaukee, WI (2007–2008)
Wendy McCown, Director, Bureau of Forestry Services, Wisconsin Department of Natural Resources
20,000–50,000 GSF on a 50 acre site
Feasibility Study for the Site and Facilities
Initial Work on Creation of a New 501(c)(3)
Project in process

City of Paso Robles
City of El Paso de Robles Town Centre/Uptown Specific Plan

Paso Robles, CA (2008)
David Sergant, Senior Planner, Moule & Polyzoides
80,000–130,000 SF on a 2 acre site
Long-Term Plan (30 years)

National Maritime Museum of the Gulf of Mexico
Mobile, AL (2007)
Tony Zodrow, Executive Director
90,000 GSF facility
Lease and Development
Agreement Negotiation
Framework
Project in process

Metropolitan Water District of Southern California
Diamond Valley Lake Visitor Center
Hemet, CA (2007–2008)
Gilbert Ivey, Chief Administrative Officer
26,000 GSF on an 11 acre site shared with a paleontology museum
Museum Facility Re-use Evaluation

Whitney Gallery of Western Art
Buffalo Bill Historical Center
Cody, WY (2007)
Mindy Besaw, Curator
17,000 GSF
Strategic Plan and Management Plan for Fiftieth Anniversary Celebration Exhibits and Events
Project in process

Audubon Nature Institute
Baton Rouge, LA (2007)
Ron Forman, President
Eskew+Dumez+Ripple Architects
Project in process

Pierre Claeyssens Veterans Museum and Library
Santa Barbara, CA (2006–2007)
Daniel P. Burnham, Chairman of the Board
40,000 GSF on a two-acre site
Strategic Plan
Project in process

Nauticus Seaport Museum
Norfolk, VA (2006–2007)
Richard Conti, Director
300,000 SF in several buildings and the historic battleship Wisconsin
Strategic Plan
Project in process

Glenstone
Annapolis, MD (2006)
--- SF private art museum on a 125-acre site
Building and spaces plan
Project completed in 2007

Museum of the American Railroad
Dallas, TX (2006)
Bob LaPrelle, President and CEO
100,000 SF on a nine-acre site
Strategic Plan and Building Statement for an expanded site
Project in process

Gerald L. Cafesjian Museum of Art
Yerevan, Armenia (2005–2006)
Gerard Cafesjian, Founder
John Waters, Foundation Director
David Hotson, Architect
300,000 SF Main Building plus 17-acre site
Building Program
Project in design

Royal Textile Academy of Bhutan
Thimphu, Bhutan (2005)
Krista Amason, Project Representative
45,000 SF on a two-acre site
Preliminary Case Statement

Harvard University Art Museums
Cambridge, MA (2004–2005)
(Fogg Art Museum, Sackler Art Museum, Busch Reisinger Museum and a new location)
Thomas W. Lentz, Director
Renzo Piano, Architect Fogg Building
Daly-Genik, Architects Site II, Allston
400,000 SF
Strategic Plan and Building Program for several buildings: Fogg Art Museum, Sackler Museum building, new offsite collection storage, art handling and office building

back to top

 

2000-2004

Mexic-Arte Museum
Austin, TX (2004)
Sylvia Orozco, Director
$12–15 Million
55,000 SF
Building Program and Strategic Plan for a New Building
Project in process

Nevada State Museum and Historical Society
Las Vegas, NV (2003–2004)
Greta Brunschwyler, Director
Paul Steelman Design Group, Architect
$35 Million
70,000 SF
Strategic Statement and Building Program for a New Building
Project under construction

Museum of History and Art Ontario
Ontario, CA (2003–2004)
Theresa Hanley, Director
Annie Chu, Chu + Gooding, Architects
Jim Strodtbeck, Director,
Ontario Redevelopment Agency
$10 Million
35,000 SF
Building Program Concept for Renovation and New Construction at Existing Site
Project in design

The Wheels Museum
Albuquerque, NM (2003–2005)
Alan Clark, Director
Joe Craig, Board Member
100,000 SF
Revisions to the Previous Strategic Plan and Site Use Concept for New Construction and Adaptive Reuse of the Historic Santa Fe Rail Yards
Project in process

Richmond Museum Collaboration Project
Richmond, IN (2002)
Kathleen Glynn, Director
Richmond Art Museum
$11 Million
80,000 SF
Feasibility Study to Join 3 Organizations (2 Existing Museums & 1 Foundation) into a Single Museum
Project cancelled

Snite Museum of Art
University of Notre Dame
Notre Dame, IN (2001)
Chuck Loving, Director
Paula Carlaccini, Project Manager/Engineer
Machado-Silvetti, Architects
152,000 SF
Feasibility Study for Renovation & Expansion
Project in process

Paul and Lulu Hilliard University Art Museum
University of Louisiana at Lafayette
Lafayette, LA (2001)
Herman Mhire, Executive Director
Eskew Dumez Ripple, Architects
$7.7 Million
25,850 SF
Project Review & Definition
Project completed 2004

Louisiana State University Art Museum at the Shaw Center for the Arts
Baton Rouge, LA (2001)
Steve Rosen, Executive Director
Schwartz/Silver Architects
Eskew Dumez Ripple, Architects & Project Managers
$14.5 Million
52,000 SF
Program Review
Project complete 2005

The Wheels Museum
Albuquerque, NM (2001)
Alan Clark, Executive Director
Feasibility Study & Prospectus for a New Museum
Project in process

Baltimore Museum of Art
Baltimore, MD (2001)
Doreen Bolger, Director
Alan Dirican, Deputy Director for Operations
Long Range Stratgic Plan for Facilities
Project postponed

University of Iowa Museum of Art
Iowa City, IA (2001)
Rod Kruse, Architect
Herbert, Lewis, Kruse, Blunck
48,000 SF
Renovation and Limited Expansion
Project completed

History Museum of Los Angeles
Los Angeles, CA (2000–2001)
Ed Avila, Project Restore
Feasibility Study and Prospectus for a New Museum
Project cancelled

Sid Richardson Museum
Fort Worth, TX (2000–2001)
Sundance Projects Group
Leslye Nunnelee
Administrative Review
Building Program Study
Site Use Feasibility Study
Project completed 2006

Miami Art Museum
Miami, FL (1998–2001)
Suzanne Delehanty, Director
100,000 SF Phase One,
200,000 SF Full Buildout
Site Selection for New Building
Project in design

Walker Art Center
Minneapolis, MN (1994–2001)
Kathy Halbreich, Director
David Galligan, Administrative Director
Herzog & de Meuron, Architects
$80 Million
120,000 New SF, 130,000 Existing SF
Expansion Program
New Construction and Renovation
Peer Review During Design
Project completed 2005

American Political History Center
Indianapolis, IN (2000)
The President Benjamin Harrison Foundation
Bill Browne, Trustee
Ratio Architects
$30 Million
70,000 SF
Feasibility Study & Prospectus for a New Museum
Project in process

Louisiana State Museum
Baton Rouge, LA (2000)
James Sefcik, Director
Eskew + Dumez + Ripple Architects
$30 Million
70,000 SF
Building Program, New Construction
Project complete 2006

Nasher Museum of Art at Duke University
Durham, NC (1999–2000)
Michael Mezzatesta, Former Director
Rafael Viñoly, Architects
$18 Million
42,000 SF
Site and Program Review
Building Program
Project completed 2005

Seattle Art Museum
Seattle, WA (1999–2000)
Mimi Gates, Director
Jeff Eby, Former Deputy Director
Brad Cloepfil, Allied Works Architects
334,000 SF
Site Expansion, Feasibility Study
Project under construction

The Rhode Island School of Design
Art Museum

Providence, RI (1999–2000)
Phillip Johnston, Director
Glenn Stinson, Deputy Director
Raphael Moneo, Architet
190,000 SF
Long-Range Feasibility Study for Expansion on the Museum Block
Project under construction

The Yale University Art Gallery
New Haven, CT (1998–2000)
Jock Reynolds, Director
Pam Delphenich, University Planning
Polshek Partnership, Architects
216,500 SF
Site Expansion Feasibility Study and Building Program
Project Phase I completed 2006
Phase II under construction

The Berlinische Galerie
Berlin, Germany (1998–2000)
Prof Jörn Merkert, Director
Fred Fisher, Architect
DEM 40 Million ($24 Million)
8,000–10,000 Sq. Meters (86,000–107,000 SF)
Progam Review
Project completed 2004

back to top

1995-1999

Virginia Museum of Fine Arts
Richmond, VA (1998)
Katharine Lee, Former Director
Richard Woodward, Acting Director
Rick Mather, Architect
$175 Million
132,000 New SF, 437,000 Existing SF
Strategic Site Development Program
Project under construction

McNay Art Museum
San Antonio, TX (1997)
Dr. William Chiego, Director
$36 Million
165,200 SF
Site Master Plan
Phased Concept Program
New Construction and Renovation
Phase I complete, Phase II under construction

The Blanton Museum of Art
(Formerly the Huntington Art Museum)
University of Texas at Austin
Austin, TX (1997)
Jessie Hite, Director
Kallman McKinnell Architects
$85 Million
150,000 SF
Building Program
Project Phase I completed 2006

University of Iowa Museum of Art
Iowa City, IA (1997)
Rod Kruse, Architect
Herbert, Lewis, Kruse, Blunck
48,000 SF
Renovation and Limited Expansion
Project completed 2004

North Carolina Museum of Art
Raleigh, NC (1995–1997)
Lawrence Wheeler, Director
Dan Gottlieb, Design Director, Art Park
Thomas Phifer, Architect
$60 Million
295,000 SF
1996–1997: Comprehensive Building Program
1995: Signage Study, Interior and Exterior
Project in design

International Center of Photography
New York, NY (1996)
Buzz Hartshorn, Director
Steve Rooney, Deputy Director
Charles Gwathmey, Architect, Renovation
Polshek Partnership Architects, New Site
$8–12 Million
55,000 SF
Site Feasibility Study and Building Program
Renovation completed 2000
New Site project unbuilt

Snite Museum of Art
University of Notre Dame
Notre Dame, IN (1996)
Dean Porter, Director
Michael Bjornberg, Architect, Ellerbe Beckett
$8–12 Million
98,000 SF
Conceptual Planning
Design Review
Project postponed

Meadows Museum
Southern Methodist University
Dallas, TX (1996)
Bill Lively, VP Development and Alumni Affairs
Hammond, Beeby, Rupert Architects
$15 Million
70,000 SF
Site Selection Feasibility Study
Preliminary Building Program
Project completed 2001

Albuquerque Museum of History and Art
Albuquerque, NM (1996)
James Moore, Director
Van Gilbert, Architect
$15 Million
110,000 SF
Master Plan Programming for Building Expansion
Construction completed 2005

USSF Space Discovery Center
Colorado Springs, CO (1996)
Jack Flannery, Director
$20 Million
60,000 SF
Planning Consultation
Project on hold

The Ventura County Museum of History and Art
Official Site

Ventura, CA (1995–1996)
Edward R. Robings, Director
Greg Smith, Board of Trustees
Project Under Construction
$4–6 Million
20–45,000 SF
Site Feasibility Study
Conceptual Programming
Project under construction

The Jewish Museum of San Francisco
San Francisco, CA (1995)
Rabbi Brian Lurie, President
Daniel Liebeskind, Architect
$60 Million
60,000 SF
Conceptual Programming
Conceptual Budgeting
Project in process

Nelson-Atkins Museum of Art
Kansas City, MO (1994–1995)
Marc Wilson, Director
Tom Mathews, Director
Steven Holl, Architect
$196 Million
280,000 SF
Space Planning Study
Alternate Site Review and Space Planning
Operations and Facilities Planning
Project under construction

back to top

1990-1994

Milwaukee Art Museum
Milwaukee, WI (1993-1994)
Santiago Calatrava, Architect
Russell Bowman, Director
Chris Goldsmith, Executive Director
$125 Million
142,000 SF new construction, 160,000 SF existing
Architect Selection (new construction)
Coordination for Building Expansion Program
Project completed 2001

Community Redevelopment Agency of Los Angeles (CRA)
Los Angeles, CA (1994)
Mickey Gustin, Arts Coordinator
Museum Development Consultant

Los Angeles County Museum of Art
Los Angeles, CA (1993–1994)
Quincy Houghton, Executive Assistant to the Director
$18 Million
290,000 SF
May Co. Site Acquisition Feasibility Study
May Co. site acquired 1995

Albuquerque Academy
Simms Performing Center
Albuquerque, NM (1993–1994)
Robert Bovinette, President
Richard Elkins, Chief Business and Financial Officer
$2.7 Million
15,000 SF
Feasibility Study and Building Program
Building Renovation and New Construction
Project completed 1998

Gardena Community Arts Center
Gardena, CA (1993–1994)
Fred Fisher, Architect
Building Program
Project cancelled

Utah Museum of Fine Arts
The Marcia and John Price Museum Building
The University of Utah
Salt Lake City, UT (1993)
Frank Sanguinetti, Director
Charles Loving, Assistant Director
Silvetti & Machado, Architects
$18 Million
74,000 SF
Feasibility and Due Diligence Study
Building Expansion
Peer Review
Project completed 2001

University of New Mexico
Galles Cultural Center
Albuquerque, NM (1993)
Roger Lujan, Campus Architect
Patrick McClernon Architects
100,000 SF
Master Plan
Feasibility and Due Diligence Study
Project cancelled

Museum of New Mexico
Santa Fe, NM (1992–1993)
Thomas Livesay, Director
SMWM Architects
275,000 SF
Master Planning Programming,
Historic Renovation and New Construction
Project Phase 1 completed 1998

El Paso Museum of Art
El Paso, TX (1993-1993)
Becky Duval Reese, Director
Booth, Kiersey, Mijares Architects
$8–10 Million
110,000 SF
Renovation and New Construction
Project completed 1998

Santa Barbara Museum of Art
Santa Barbara, CA (1992–1993)
Paul Perrot, Director
$4.5 Million
20,000 SF
Renovation and New Construction
Project completed 1998

The Latino Museum
Los Angeles, CA (1991–1993)
Antonia Hernandez, Chair
100,000 SF
Site Acquisition and Building Planning
Project cancelled

Ho Am Art Museum Complex
Seoul, South Korea (1992)
Kyu Sung Woo, Architect for Ho Am Complex
400,000 SF
New Construction plus Sculpture Garden
Project cancelled

The Museum of Contemporary Art, Los Angeles
The Temporary Contemporary

Los Angeles, CA (1992)
Richard Koshalek, Director
Frank Gehry, Architect
$4.2 Million
55,000 SF
Renovation and Addition of Climate Control
Project cancelled

University of California, Riverside
Inter-Arts Center
Riverside, CA (1992)
Dilip Anketell, Director, Campus Planning
Frank Israel and BOOR/A Architects
100,000 SF
Renovation and New Construction
Project completed 1997

The Tech Museum of Innovation
San Jose, CA (1991–1992, 1986–1987)
Peter Giles, President
Ricardo Legorreta, Architect
$113 Million
132,000 SF
New Construction and Renovation
Project completed 1998

The Craft and Folk Art Museum
Los Angeles, CA (1990–1992)
Patrick Ela, Director
Hodgetts & Fung Architects
$6 Million
30,000 SF
Renovation and New Construction
Project completed 1995

The J.B. Speed Art Museum
Louisville, KY (1991)
Peter Morrin, Director
$12 Million
70,000–90,000 SF
Renovation
Project complete 1997

Millard Sheets Art Center
Scripps College
Claremont, CA (1991)
Nancy Beckevac, President
Anshen + Allen Architects
30,000 SF
Renovation
Project completed 1994

South Bronx Academy of Art
Bronx, NY (1991)
Tim Rollins & K.O.S. Art & Knowledge Workshop
Tim Rollins, Director
Aldo Rossi, Architect
25,000 SF
New Construction
Project cancelled

FHP Medical Corporation Galleries
Salt Lake City and other locations (1991)
Cynthia McMullan, Gallery Director
Valentiner Architects
5,000 SF
New Construction
Project completed 1992

Hoover Dam Visitor’s Center
Handicap Access Review
Hoover Dam, NV (1991)
Barry Howard, Designer
Building Program Consultant
Project completed 1994

The Andy Warhol Museum
Carnegie Museums of Pittsburgh
Pittsburgh, PA (1990)
Phillip Johnston, Diector
Richard Gluckman, Architect
$20 Million
85,000 SF
Renovation
Project completed 1994

Wellesley College Art Museum
Wellesley, MA (1989–1990)
Davis Art Center & New Museum
Susan Taylor, Director
Rafael Moneo, Architect
$18 Million
70,000 SF
Renovation and New Construction
Project completed 1993

Museum of Contemporary Art
Chicago, IL (1988–1990)
Mary Ittelson, Deputy Director
Josef Kleihaus, Architect
$45 Million
172,000 SF
New Construction
Project completed 1996

back to top

1985-1989

San Francisco Museum of Modern Art (SFMOMA)
Permanent Building
San Francisco, CA (1987–1989)
John R. Lane, Director
Mario Botta, Architect
$55 Million
225,000 SF
New Construction
Project completed 1995

San Francisco Museum of Modern Art (SFMOMA)
Jessie Street Substation
San Francisco, CA (1987–1989)
John R. Lane, Director
$9 Million
20,000 SF
Historic Renovation
Project cancelled

The Hess Collection and the Napa Valley Art Foundation
Napa Valley, CA (1987)
Donald Hess, Client
Beat Jordi, Architect
16,000 SF
Renovation and New Construction
Project completed 1989

Broad Foundation Headquarters
Santa Monica, CA (1987)
Eli Broad, Client
Fred Fisher, Architect
26,000 SF
Renovation
Project Completed 1988–89

The San Diego Art Center
San Diego, CA (1984–1985)
Sebastian Adler, Director
Richard Weinstein, Architect
30,000 SF
New Construction
Project cancelled

The Museum of Contemporary Art, Los Angeles (MOCA)
Los Angeles, CA (1982–1986)
Frederick Nicholas, Vice Chairman, Board of Trustees
Arata Isozaki, Architect
$24 Million
100,000 SF
New Construction
Project completed 1986

back to top

1977-1984

The Museum of Contemporary Art
New Museum Administrative Start Up
Los Angeles, CA (1981–1982)
Richard Koshalek, Director
Architecture and Administrative Planning Consultant
Project completed 1982

Museum für Kunsthandwerk
Frankfurt, Germany (1980)
Richard Meier and Partners
Richard Meier and Partners, Architects
40,000 SF
Renovation and New Construction
Project completed 1986

“LA, 200 YEARS” (Pershing Square)
Los Angeles Bicentennial Exhibition
Los Angeles, CA (1980)
Office of Richard Saul Wurman
2,000 SF
Exhibition Design
Project completed 1981

IBM Exhibit Center
“Inventions” Exhibit
New York, NY (1977–1979)
Office of Charles and Ray Eames, Venice, CA
Edward Larrabee Barnes, Architect
Client: IBM, 590 Madison Avenue
10,000 SF
Exhibition Design
Project closed due to closure of Eames office

back to top